Family day ONE-Dyas at HSM Schiedam

At the family day at HSM in Schiedam, the employees of ONE-Dyas and HSM as well as the employees and family of SEW Energy had the opportunity to view the N05 platform. SEW Energy BV, in collaboration with Multimetaal – Den Helder, manufactured and installed most of the piping on the platform. During a tour of the island, the various technical and living areas could be visited. Quite an experience, as a family you do not often have the opportunity to look at a platform where your family member works.

The N05-A gas field is located 20 kilometers north of Schiermonnikoog. The platform is designed to develop this field, and in the future also nearby fields, and to contribute a substantial part to the security of gas supply for the Netherlands. The N05-A platform runs entirely on offshore wind energy from the German wind farm Riffgat, meaning emissions are virtually zero. The platform is also suitable for producing green hydrogen and/or for storing CO2 in the future.

The topside consists of three decks and a helipad. The dimensions are 60*30*25 meters and it weighs 2,800 tons.

From SEW we would like to thank ONE-Dyas and HSM for this day and the opportunity to show this beautiful project to our colleagues and their families.

Interested?

Are you interested and do you have questions? Contact us at 0226-310000 or complete the form on the contact page!

Contact with SEW