Completion Of Project: Prefab Piping and Installation on-site for two Production Platforms

June 2021

Completion of the project

A well-known Dutch construction Company has commissioned SEW Energy for fabrication of the piping and deliver it to their yard. On location, SEW installed the piping in the platforms and jacket/ monopile. Where necessary, field welds have been performed on site.

The project includes:

  • Prefab pipework (2129 connections welded) in the SEW workshop
  • These spools ranged from 2″ to 24″ and from carbon steel to duplex
  • Installation of prefab pipework (399 welds performed in the field) in the platforms
  • Installed 225 ctuated and non-actuated valves for the project (largest was 24″)
  • Torqued a total of 751 flanges at both platforms
  • Installed risers in the jacket (9 risers installed in the diameters 3″, 6″, 8″, 10″, 12″ and 24″)
  • And both platforms have been tested at high pressure with liquid and nitrogen

See SEW references

And HSM LinkedIn page

Completion Of Project: Prefab Piping and Installation on-site for two Production Platforms

Interested?

Are you interested and do you have questions? Contact us at 0226-310000 or complete the form on the contact page!

Contact with SEW